Call 484-770-8764 To Schedule Cleaning
Call 8am - 5pm EST Schedule or Online 24/7

imgFinal/Rough/Touch-Up/Cleaning

Complete cleaning specs for final construction cleaning apartments.

Scope

  1. Specifications: Final Cleaning :
    1. Thoroughly sweep, vacuum and wet mop all floors.
    2. Detail clean all individual units
    3. Detail clean all common areas, corridors, lobbies, vestibules, front desk, etc…
    4. Detail clean all offices, meeting room, board room, work area, business center, linen, laundry, storage, etc…
    5. Detail clean food prep, pantry, breakfast area, break room, etc…
    6. Detail clean fitness center, pool area, etc…
    7. Detail dust and wipe down all walls, baseboards, doors, surfaces, fixtures, vents, etc.
    8. Clean all interior glass surfaces inside; remove any stickers or labels.
    9. Clean Toilet Rooms and bathrooms – walls, floors, light lenses, toilets, sinks, counters, partitions, mirrors, fixtures and accessories; disinfect sinks and fixtures.
    10. Wipe down both sides and tops of all doors.
    11. Vacuum carpeting and similar soft surfaces, removing debris and excess nap.
    12. Vacuum clean all interior floor surfaces.       
    13. Clean transparent materials, including mirrors and glass in doors.  

                                                    i.     Remove glazing compounds and other noticeable, vision obscuring materials.

                                                  ii.     Polish mirrors and glass, taking care not to scratch surfaces.

    1. Vacuum and damp wipe all cabinetry, casework and countertops, inside and out.
    2. Wipe down all door frames.
    3. Wipe down pipe and equipment in mechanical rooms and fire sprinkler rooms.
    4. Wipe down all structure columns to 10 ‘ above finished floor.
    5. Remove any minor trash found in building.
    6. Wipe down all FRP and ceramic wall tile.     
    7. Wipe down sanitary cove base.        
    8. Leave Janitors Closet clean and orderly.      
    9. Detail clean staircases.
    10. Detail clean elevators.
    11. Clean storage closets.
    12. Leave project clean and ready for occupancy.
    13. Prior to final completion, conduct an inspection of sight-exposed interior surfaces and all work areas with construction manager to verify that entire Work is clean.
  1. Detail Clean Kitchen:
    1. Clean appliances, hoods and vents
    2. Clean and wipe down all stainless steel food preparation equipment and sinks; inside and out.
    3. Polish all stainless steel and plumbing fixtures
    4. Wash and shine counter tops. Clean all sinks, drains and ice bins.
    5. Vacuum and wipe down all cabinets, drawers and shelves.
    6. Clean storage closets. Clean all  refrigerators and freezers including metal shelving
    7. Clean and mop floor tile.
  2. Strip and Refinish VCT Flooring :
    1. Scrub VCT Floor using an auto scrubber with maximum pad pressure equipped with black pads or stripping brushes to remove dirt and factory finish.
    2. Thoroughly rinse floor to remove any residue of cleaning or stripper solution.          
    3. Let floor dry completely.        
    4. Apply sealer coat and let completely dry      
    5. Apply 2 new finish coats        
  3. Window cleaning – Inside and out:
    1. Wash and scrape all windows
    2. Wipe down all window framing
    3. Wipe down all tracks and windowsills.

Complete cleaning specs for final construction cleaning convenience stores.

Scope

CONVENIENCE STORE:

Final Cleaning – Entire Building:

a.     Thoroughly sweep, vacuum and wet mop all floors

b.     Detail dust and wipe down all walls, baseboards, doors, surfaces, fixtures, vents etc.

c.     Detail clean all offices and common areas

d.     Clean all glass surfaces inside and out; remove any stickers or labels.

e.     Clean Toilet Rooms – walls, floors, light lenses, toilets, sinks, counters, partitions, mirrors, fixtures and accessories; disinfect sinks and fixtures.

f.       Wipe down both sides and tops of all doors.

g.     Wipe down all door frames.

h.     Vacuum and damp mop concrete surfaces

i.       Vacuum carpeting and similar soft surfaces, removing debris and excess nap;

j.       Clean transparent materials, including mirrors and glass in doors.

k.     Remove glazing compounds and other noticeable, vision obscuring materials.

l.       Polish mirrors and glass, taking care not to scratch surfaces.

m.   Vacuum and damp wipe all cabinetry, casework and countertops, inside and out.          

n.     Wipe down pipe and equipment in mechanical rooms and fire sprinkler rooms.

o.     Wipe down all structure columns to 10′ above finished floor.

p.     Remove any minor trash found in building.

q.     Wipe down all FRP and ceramic wall tile.   

r.      Wipe down sanitary cove base.       

s.     Leave Janitors Closet clean and orderly.    

t.       Clean and wipe down all stainless-steel food preparation equipment and sinks; inside and out.    

u.     Clean and disinfect water coolers.

v.     Clean refrigerated self-serve units inside and out.

w.    Clean grocery Equipment inside and out.   

x.     Wipe down all air curtains.

y.     Detail clean inside and outside of walk in refrigerators and freezers

z.      Detail clean and wipe out all display islands and Check Out Island.

aa.  Remove any and all protective film from walk-in doors and walls  

bb. Wipe down all kitchen appliances, counter tops, etc.

cc.  Leave project clean and ready for occupancy.

dd. Prior to final completion, conduct an inspection of sight-exposed interior surfaces and all work areas with construction manager to verify that entire Work is clean.                                

Window cleaning – Interior and Perimeter Glass – Both sides                                      

a.    Remove all stickers and labels

b.   Wash and scrape all windows

c.    Wipe down all window framing

d.   Wipe down all tracks and window sills

Complete cleaning specs for final construction cleaning fast food restaurants.

Scope

FAST FOOD RESTAURANT:

  1. General Cleaning
    1. Thoroughly sweep, vacuum and wet mop all floors
    2. Detail dust and wipe down all walls, baseboards, doors, surfaces, fixtures, vents etc…
    3. Detail clean all offices
    4. Clean all interior glass surfaces; both sides; remove any stickers or labels.
    5. Clean Toilet Rooms – walls, floors, light lenses, sinks, counters, partitions, mirrors, fixtures and accessories; disinfect sinks and fixtures.
    6. Wipe down both sides and tops of all doors.
    7. Vacuum and damp mop concrete surfaces.
    8. Vacuum carpeting and similar soft surfaces, removing debris and excess nap;
    9. Vacuum clean all carpeted floor surfaces.
    10. Clean transparent materials, including mirrors and glass in doors.
  1. Remove glazing compounds and other noticeable vision obscuring materials.

ii.    Polish mirrors and glass, taking care not to scratch surfaces.

    1. Vacuum and damp wipe all cabinetry, casework and countertops, inside and out.
    2. Wipe down all door frames.
    3. Wipe down pipe and equipment in mechanical rooms and fire sprinkler rooms.
    4. Wipe down all structure columns to 10 ‘ above finished floor.
    5. Remove any minor trash found in building.
    6. Wipe down all FRP and ceramic wall tile.
    7. Wipe down sanitary cove base.
    8. Leave Janitors Closet clean and orderly.
  1. Clean all Entrances and lobby
    1. Clean and polish all metal hardware.
    2. Clean all tables and chairs.  Clean entrance glass doors inside and out.
    3. Clean all glass and mirrors.
    4. Dust walls, high ledges, light fixtures and air ducts.
    5. Dust baseboards, plug covers and light switches.
    6. Polish handrails. Dust and clean reception area.
    7. Vacuum carpeted areas.  Clean and mop floor tiles
  2. Dining Area
    1. Clean all tables and chairs
    2. Detail all woodwork and clean all glass and mirrors
    3. Dust baseboards, doors, doorknobs, plug covers and light switches
    4. Polish handrails. Dust windowsills and frames.
    5. Clean appliances, hoods and vents. Polish stainless steel and plumbing fixtures.
    6. Wash and shine counter tops.
    7. Vacuum and wipe down all cabinets, drawers and shelves.
    8. Clean all sinks and drains. Clean refrigerators and ice bins
    9. Vacuum all carpeted areas
    10. Machine clean tile floors and seal upon request
  3. Detail Clean Kitchen
    1. Clean appliances, hoods and vents
    2. Clean and wipe down all stainless-steel food preparation equipment and sinks; inside and out.
    3. Polish all stainless steel and plumbing fixtures
    4. Wash and shine counter tops. Clean all sinks, drains and ice bins.
    5. Vacuum and wipe down all cabinets, drawers and shelves.
    6. Clean storage closets. Clean all walk-in refrigerators and freezers including metal shelving
    7. Clean and mop floor tile. Machine clean tile floors and seal upon request
  4. Window cleaning – Inside and outside
    1. Wash and scrape all windows
    2. Wipe down all window framing
    3. Wipe down all tracks and windowsills
  5. Prior to final completion,
    1. Conduct an inspection of sight-exposed interior surfaces and all work areas with construction manager to verify that entire Work is clean.

Complete cleaning specs for final construction cleaning hotels.

Scope

HOTEL:

  1. Specifications: Final Cleaning :
    1. Thoroughly sweep, vacuum and wet mop all floors.
    2. Detail clean all individual units
    3. Detail clean all common areas, corridors, lobbies, vestibules, front desk, etc…
    4. Detail clean all offices, meeting room, board room, work area, business center, linen, laundry, storage, etc…
    5. Detail clean food prep, pantry, breakfast area, break room, etc…
    6. Detail clean fitness center, pool area, etc…
    7. Detail dust and wipe down all walls, baseboards, doors, surfaces, fixtures, vents, etc.
    8. Clean all interior glass surfaces inside; remove any stickers or labels.
    9. Clean Toilet Rooms and bathrooms – walls, floors, light lenses, toilets, sinks, counters, partitions, mirrors, fixtures and accessories; disinfect sinks and fixtures.
    10. Wipe down both sides and tops of all doors.
    11. Vacuum carpeting and similar soft surfaces, removing debris and excess nap.
    12. Vacuum clean all interior floor surfaces.       
    13. Clean transparent materials, including mirrors and glass in doors.  

                                                    i.     Remove glazing compounds and other noticeable, vision obscuring materials.

                                                  ii.     Polish mirrors and glass, taking care not to scratch surfaces.

    1. Vacuum and damp wipe all cabinetry, casework and countertops, inside and out.
    2. Wipe down all door frames.
    3. Wipe down pipe and equipment in mechanical rooms and fire sprinkler rooms.
    4. Wipe down all structure columns to 10 ‘ above finished floor.
    5. Remove any minor trash found in building.
    6. Wipe down all FRP and ceramic wall tile.     
    7. Wipe down sanitary cove base.        
    8. Leave Janitors Closet clean and orderly.      
    9. Detail clean staircases.
    10. Detail clean elevators.
    11. Clean storage closets.
    12. Leave project clean and ready for occupancy.
    13. Prior to final completion, conduct an inspection of sight-exposed interior surfaces and all work areas with construction manager to verify that entire Work is clean.
  1. Detail Clean Kitchen:
    1. Clean appliances, hoods and vents
    2. Clean and wipe down all stainless steel food preparation equipment and sinks; inside and out.
    3. Polish all stainless steel and plumbing fixtures
    4. Wash and shine counter tops. Clean all sinks, drains and ice bins.
    5. Vacuum and wipe down all cabinets, drawers and shelves.
    6. Clean storage closets. Clean all  refrigerators and freezers including metal shelving
    7. Clean and mop floor tile.
  2. Strip and Refinish VCT Flooring :
    1. Scrub VCT Floor using an auto scrubber with maximum pad pressure equipped with black pads or stripping brushes to remove dirt and factory finish.
    2. Thoroughly rinse floor to remove any residue of cleaning or stripper solution.          
    3. Let floor dry completely.        
    4. Apply sealer coat and let completely dry      
    5. Apply 2 new finish coats        
  3. Window cleaning – Inside and out:
    1. Wash and scrape all windows
    2. Wipe down all window framing
    3. Wipe down all tracks and windowsills.

Complete cleaning specs for final construction cleaning office buildings.

Scope

OFFICE BUILDING:

  1. Detail Construction Clean-up: 
    1. Thoroughly sweep, vacuum and wet mop all floors              
    2. Detail dust and wipe down all walls, baseboards, doors, surfaces, fixtures, vents etc…   
    3. Detail clean all common areas, corridors, lunchrooms, etc…
    4. Detail clean all offices, conference room, etc…
    5. Dust and damp wipe all horizontal and vertical moldings and surfaces, door jams and ledges.           
    6. Clean all interior glass surfaces on both sides; Remove any stickers or labels. 
    7. Clean Toilet Rooms – walls, floors, light lenses, toilets, sinks, counters, partitions, mirrors, fixtures and accessories; disinfect sinks and fixtures.
    8. Wipe down both sides and tops of all doors.
    9. Vacuum carpeting and similar soft surfaces, removing debris and excess nap;   
    10. Clean transparent materials, including mirrors and glass in doors.  

                                                    i.     Remove glazing compounds and other noticeable, vision obscuring materials.

                                                  ii.     Polish mirrors and glass, taking care not to scratch surfaces.

    1. Vacuum and damp wipe all cabinetry, casework, millwork and countertops, inside and out.              
    2. Wipe down all door frames.   
    3. Wipe down pipe and equipment in mechanical and electrical rooms and fire sprinkler rooms.        
    4. Wipe down all structure columns to 10 ‘ above finished floor.          
    5. Remove any minor trash found in building.   
    6. Wipe down all FRP and ceramic wall tile.     
    7. Wipe down sanitary cove base.        
    8. Clean all maintenance closets’ sinks, walls, and floor surfaces.                  
    9. Leave project clean and ready for occupancy.
    10. Prior to final completion, conduct an inspection of sight-exposed interior surfaces and all work areas with construction manager to verify that entire Work is clean.
  1. Strip and Refinish VCT Flooring
    1. Scrub VCT Floor using an auto scrubber with maximum pad pressure equipped with black pads or stripping brushes to remove dirt and factory finish.
    2. Thoroughly rinse floor to remove any residue of cleaning or stripper solution.
    3. Let floor dry completely.
    4. Apply sealer coat and let completely dry
    5. Apply 2 new finish coats
  2. Window cleaning – Inside and outside
    1. Wash and scrape all windows
    2. Wipe down all window framing

Complete cleaning specs for final construction cleaning restaurants.

Scope

RESTAURANT:

General Cleaning

    1. Thoroughly sweep, vacuum and wet mop all floors
    2. Detail dust and wipe down all walls, baseboards, doors, surfaces, fixtures, vents etc…
    3. Detail clean all offices
    4. Clean all interior glass surfaces; both sides; remove any stickers or labels.
    5. Clean Toilet Rooms – walls, floors, light lenses, sinks, counters, partitions, mirrors, fixtures and accessories;
    6. Wipe down both sides and tops of all doors.
    7. Vacuum and damp mop concrete surfaces.
    8. Vacuum carpeting and similar soft surfaces, removing debris and excess nap;
    9. Vacuum clean all carpeted floor surfaces.
    10. Clean transparent materials, including mirrors and glass in doors.
  1. Remove glazing compounds and other vision obscuring materials.

ii.     Polish mirrors and glass, taking care not to scratch surfaces.

    1. Vacuum and damp wipe all cabinetry, casework and countertops, inside and out.
    2. Wipe down all door frames.
    3. Wipe down all overhead doors inside and out.
    4. Wipe down pipe and equipment in mechanical rooms and fire sprinkler rooms.
    5. Wipe down all structure columns to 10 ‘ above finished floor.
    6. Remove any minor trash found in building.
    7. Wipe down all FRP and ceramic wall tile.
    8. Wipe down sanitary cove base.
    9. Leave Janitors Closet clean and orderly.

Clean all Entrances and lobby

    1. Clean and polish all metal hardware.
    2. Clean all tables and chairs.  Clean entrance glass doors inside and out.
    3. Detail all woodwork and clean all glass and mirrors.
    4. Dust walls, high ledges, light fixtures and air ducts.
    5. Dust baseboards, plug covers and light switches.
    6. Polish handrails. Dust and clean reception area.
    7. Vacuum carpeted areas.  Clean and mop floor tiles

Dining and Bar Areas

    1. Clean all tables, chairs and barstools.
    2. Detail all woodwork and clean all glass and mirrors
    3. Dust baseboards, doors, doorknobs, plug covers and light switches
    4. Polish handrails. Dust windowsills and frames.
    5. Clean appliances, hoods and vents. Polish stainless steel and plumbing fixtures.
    6. Wash and shine counter tops.
    7. Vacuum and wipe down all cabinets, drawers and shelves.
    8. Clean all sinks and drains. Clean refrigerators and ice bins
    9. Vacuum all carpeted areas
    10. Machine clean tile floors and seal upon request

Detail Clean Kitchen

    1. Clean appliances, hoods and vents
    2. Clean and wipe down all stainless-steel food preparation equipment and sinks; inside and out.
    3. Polish all stainless steel and plumbing fixtures
    4. Wash and shine counter tops. Clean all sinks, drains and ice bins.
    5. Vacuum and wipe down all cabinets, drawers and shelves.
    6. Clean storage closets. Clean all walk-in refrigerators and freezers including metal shelving
    7. Clean and mop floor tile. Machine clean tile floors if necessary.
  1. Window cleaning – Inside and outside
    1. Wash and scrape all windows
    2. Wipe down all window framing
    3. Wipe down all tracks and windowsills

Prior to final completion

    1. Conduct an inspection of sight-exposed interior surfaces and all work areas with construction manager to verify that entire Work is clean.

Complete cleaning specs for final construction retail stores.

Scope

RETAIL STORE:

  1. Detail Construction Clean-up: Sales, Receiving Area, Stockroom, Storage, Office, Restrooms
    1. Thoroughly sweep, vacuum and wet mop all floors.
    2. Detail dust and wipe down all walls, baseboards, doors, surfaces, fixtures, vents etc.
    3. Detail clean all fitting rooms
    4. Detail clean all offices
    5. Clean all interior glass surfaces both sides; remove any stickers or labels.
    6. Clean Toilet Rooms – Toilets, walls, floors, light lenses, sinks, counters, partitions, mirrors, fixtures and accessories; disinfect sinks and fixtures.
    7. Wipe down both sides and tops of all doors.
    8. Vacuum and damp mop concrete surfaces.
    9. Vacuum carpeting and similar soft surfaces, removing debris and excess nap.    
    10. Clean door frames, hinges and switch plates.
    11. Clean transparent materials, including mirrors and glass in doors.
    12. Remove glazing compounds and other noticeable, vision obscuring materials.
    13. Polish mirrors and interior glass, taking care not to scratch surfaces.
    14. Vacuum and damp wipe all cabinetry and casework inside and out.
    15. Vacuum and damp wipe all counter tops and millwork.
    16. Vacuum and damp wipe all fixtures, racks and displays.
    17. Vacuum and damp wipe Cashwrap.  
    18. Wipe down pipe and equipment in mechanical rooms and fire sprinkler rooms.
    19. Wipe down all structure columns to 10 ‘ above finished floor.
    20. Remove any minor trash found in building.
    21. Wipe down all FRP and ceramic wall tile.
    22. Wipe down sanitary cove base.        
    23. Leave Janitors Closet clean and orderly.                  
    24. Leave project clean and ready for occupancy.
    25. Prior to final completion, conduct an inspection of sight-exposed interior surfaces and all work areas with construction manager to verify that entire Work is clean.
  2. Strip and Refinish VCT Flooring:
    1. Scrub VCT Floor using an auto scrubber with maximum pad pressure equipped with black pads or stripping brushes to remove dirt and factory finish.
    2. Thoroughly rinse floor to remove any residue of cleaning or stripper solution.          
    3. Let floor dry completely.        
    4. Apply sealer coat and let completely dry      
    5. Apply 2 new finish coats        
  1. Window cleaning – Inside and out
    1. Wash and scrape all windows both inside and out
    2. Wipe down all window framing
    3. Wipe down all tracks and windowsills and Marlite

Complete cleaning specs for final construction supermarket cleaning

Scope

Supermarket:

Final Cleaning – Entire Building:

a.     Thoroughly sweep, vacuum and wet mop all floors

b.     Detail dust and wipe down all walls, baseboards, doors, surfaces, fixtures, vents etc.

c.     Detail clean all offices and common areas

d.     Clean all glass surfaces inside and out; remove any stickers or labels.

e.     Clean Toilet Rooms – walls, floors, light lenses, toilets, sinks, counters, partitions, mirrors, fixtures and accessories; disinfect sinks and fixtures.

f.       Wipe down both sides and tops of all doors.

g.     Wipe down all door frames.

h.     Vacuum and damp mop concrete surfaces

i.       Vacuum carpeting and similar soft surfaces, removing debris and excess nap;

j.       Clean transparent materials, including mirrors and glass in doors.

k.     Remove glazing compounds and other noticeable, vision obscuring materials.

l.       Polish mirrors and glass, taking care not to scratch surfaces.

m.   Vacuum and damp wipe all cabinetry, casework and countertops, inside and out.          

n.     Wipe down pipe and equipment in mechanical rooms and fire sprinkler rooms.

o.     Wipe down all structure columns to 10′ above finished floor.

p.     Remove any minor trash found in building.

q.     Wipe down all FRP and ceramic wall tile.   

r.      Wipe down sanitary cove base.       

s.     Leave Janitors Closet clean and orderly.    

t.       Clean and wipe down all stainless-steel food preparation equipment and sinks; inside and out.    

u.     Clean and disinfect water coolers.

v.     Clean refrigerated self-serve units inside and out.

w.    Clean grocery Equipment inside and out.   

x.     Wipe down all air curtains.

y.     Detail clean inside and outside of walk in refrigerators and freezers

z.      Detail clean and wipe out all display islands and Check Out Island.

aa.  Remove any and all protective film from walk-in doors and walls  

bb. Wipe down all kitchen appliances, counter tops, etc.

cc.  Leave project clean and ready for occupancy.

dd. Prior to final completion, conduct an inspection of sight-exposed interior surfaces and all work areas with construction manager to verify that entire Work is clean.                                

Window cleaning – Interior and Perimeter Glass – Both sides                                      

a.    Remove all stickers and labels

b.   Wash and scrape all windows

c.    Wipe down all window framing

d.   Wipe down all tracks and window sills